Commissioning of two PV plants in Extremadura, Spain, with SmartPV solutions
Near 50 MWp of our SmartPV solution were integrated into the electric network during the last months
Title block

These solar parks consists of a total of 6 Power Inverter Stations, each one, composed of GPTech SmartPV inverter based on the WD3 technology, MV transformer and protection cabinet.
Burguillos Solar Park. Source: Irradia, 2020
San Jorge Solar Park. Source: Irradia, 2020
GPTech together with the support of Irradia's team were responsible for the commissioning of the PV inverters, checking the correct installation and operation of the power system. Each Power Inverter Station has 2 or 3 power modules, which are capable of producing more than 1 MW of energy per module.
The whole team has far exceeded expectations, meeting deadlines and working times despite having to withstand very harsh weather conditions.
In addition, all the safety, health and hygiene measures imposed during this time of health crisis have always been respected.
Burguillos Solar Park. Source: Irradia, 2020